Paul Steane's Photography Pages

279/638
Home /

Hollins Green

20200525_152611.jpg LitochoroThumbnailsAnykščiaiLitochoroThumbnailsAnykščiaiLitochoroThumbnailsAnykščiaiLitochoroThumbnailsAnykščiaiLitochoroThumbnailsAnykščiaiLitochoroThumbnailsAnykščiaiLitochoroThumbnailsAnykščiai

Looking northwards along the old main road through Hollins Green village (replaced by the A57 bypass), the HS2 planned route climbs here from left to right with the 1320 m long viaduct over the Manchester Ship Canal. At this point there will be about 19 m height from rail level to road level; this is all to get the required clearance over the Ship Canal.

Visits
2905
Rating score
no rating
Rate this photo