171/477
Looking northwards along the old main road through Hollins Green village (replaced by the A57 bypass), the HS2 planned route climbs here from left to right with the 1320 m long viaduct over the Manchester Ship Canal. At this point there will be about 19 m height from rail level to road level; this is all to get the required clearance over the Ship Canal.
- Created on
- Monday 25 May 2020
- Posted on
- Wednesday 17 June 2020
- Keywords
- England, HS2 Planned Route, United Kingdom
- Albums
- Visits
- 2946
- Rating score
- no rating
- Rate this photo